Dubai, United Arab Emirates
Made for life under the sun Ask the assistant عربي Trade & Specifier
Home/Products/Tents
Tents

Covered space, for a fortnight or for years.

Clear-span, pagoda, majlis, arcum, polygon, curve and gazebo — erected for a season and struck without a trace, or bought, anchored and put on a schedule like any other structure on your site.

Frames
Extruded aluminium 6061-T6, or hot-dip galvanised steel
Roofs
PVC-coated polyester, 650 to 900 g/m²
Spans
3 × 3 m gazebo to 40 m clear span, in 5 m bays
Anchoring
Ballasted, ground-anchored or bolted — decided on site

Priced after we know the span, the ground and how long it stands. Send a rough size, a photograph of the space and your dates and we can usually price it on the call.

A white clear-span tent standing on a villa lawn at dusk, with concrete ballast blocks laid across the grass.
Start here

Are you hiring one, or buying one?

It is the first question because it changes the rest of them — the membrane grade, how the tent is held down, the paperwork, and who owns it in March.

You need it for a date

Hire

We bring it, put it up, and take it away again. Ballasted so nothing is drilled, and the ground is handed back as we found it. Most event, wedding and activation work goes this way.

  • Set-up and strike by our crew
  • Nothing fixed into your ground
  • Membrane, lining and flooring included in the scope
  • Approvals handled as part of the job where you want that
You need it season after season

Buy

The tent becomes your asset. Specified in a heavier membrane, anchored or bolted properly, handed over with the drawings and the fire certificate, and put on an inspection schedule so it can be certified again next year.

  • Heavier membrane, specified for how long it will stand
  • Anchored or bolted rather than only ballasted
  • Handover file — drawings, certificates, asset record
  • Re-skinned rather than replaced when the roof reaches its age

Not sure which is the better buy? If you will want the same tent again next season, owning and storing it often costs less than hiring twice. Tell us the dates and we will do that arithmetic with you rather than for ourselves.

The range

Seven structures. Filter to the two that fit.

What it is for
Rough capacity
A white clear-span tent standing on a villa lawn at dusk, with concrete ballast blocks laid across the grass.
A-frame · 10 to 40 m

Clear-span tent

The workhorse. A gabled aluminium frame in 5 m bays with nothing standing in the middle of the floor, walled or open, from a garden marquee up to a hall you could park a truck in.

Ramadan Events Storage
Frame
Extruded aluminium alloy 6061-T6
Connectors
Hot-dip galvanised steel
Membrane
850 g/m² PVC-coated polyester
Span
10 · 15 · 20 · 25 · 30 · 40 m
Eave height
3 m to 20 m span · 4 m from 25 m
Bay
5 m modules, extendable in either direction
Walls
PVC, glass, ABS or sandwich panel
Design wind
[ figure and standard — confirm ]

Length is set by how many 5 m bays you add, so a clear-span tent is sized by the span first and the length second.

A red and gold Sadu-patterned majlis tent with tied curtains and floor seating, on a paved terrace.
Sha'ar and Sadu · made to the space

Majlis tent

A traditional majlis built properly: a galvanised steel frame under a machine-stitched sha'ar outer, lined in Sadu cloth, and finished inside with the lighting, flooring and seating that decide how it actually feels.

Ramadan Events Seasonal
Frame
Hot-dip galvanised steel
Outer
Machine-stitched sha'ar — black or white
Lining
Sadu cloth
Glazing
Window band, optional
Fit-out
Lighting, flooring, seating, screening
Size
Made to the space rather than to a catalogue size
Sha'ar and Sadu sourcing
[ mill and origin — confirm ]

The frame is the cheap half. Almost everything a guest notices is the lining, the light and the floor.

Rows of white high-peak pagoda tents laid out along an event lawn.
High peak · clear floor

Pagoda tent

The shape everyone recognises. The peak is carried on cross-cables to the corners, so nothing stands on the floor, and bays link into a run as long as you need.

Events Ramadan Seasonal
Frame
Galvanised steel tube or extruded aluminium
Connectors and base plate
Hot-dip galvanised steel
Roof and gable
850 g/m² PVC-coated polyester
Peak
Carried on cross-cables — no pole to the ground
Layout
Single, or linked into a continuous run
Options
PVC windows, glass or ABS walls, glass doors, carpet, lining, cooling, lighting
Design wind
[ figure and standard — confirm ]

Pagodas link. One is a bay; six in a row is a concourse. Tell us the run, not the unit.

An open-sided gazebo lit at night with hanging lanterns and floor seating around a low table.
3 × 3 m to 6 × 6 m

Gazebo

Four standard sizes, open on all sides or curtained. The small end of the range and the quickest thing we put up.

Events Seasonal Ramadan
Frame
Extruded aluminium alloy 6061-T6
Connectors
Hot-dip galvanised steel
Membrane
850 g/m² PVC-coated polyester
Standard sizes
3 × 3 · 4 × 4 · 5 × 5 · 6 × 6 m
Sides
Open, or curtained on any face
Assembly
Demountable — up and down without tools on site
Design wind
[ figure and standard — confirm ]

The only tent in the range that a private customer usually buys outright rather than hires.

A large arched-roof tent with a fully glazed gable, lit from inside at dusk.
Arched roof · 10 to 30 m

Arcum tent

A clear-span frame with a curved roof beam instead of a ridge. Same clear floor, more height through the middle, and a shape that reads as architecture rather than as a marquee.

Events Storage
Frame
Extruded aluminium 6061-T6, pre-pressed arched roof beam
Membrane
850 g/m² PVC-coated polyester
Span
10 · 15 · 20 · 30 m
Eave height
4 m — 5 m available at 30 m span
Ridge height
5.6 m at 10 m span, to 10.8 m at 30 m
Bay
5 m modules
Walls
PVC, glass, ABS or sandwich panel
Design wind
[ figure and standard — confirm ]

Chosen over a gable when the inside is going to be photographed.

A multi-sided polygon tent with full-height glazed walls and doors, lit from within at dusk.
Multi-sided · from 10 m

Polygon tent

A multi-sided structure that reads as a pavilion rather than a tent. Glazed all the way round it becomes a room; it can also be linked onto a clear-span run as an entrance.

Events Storage
Frame
Extruded aluminium 6061-T6
Membrane
850 g/m² PVC-coated polyester
Span
From 10 m
Maximum span
[ upper limit — confirm ]
Walls
PVC, glass panel, ABS or sandwich panel
Connectors
Hot-dip galvanised steel
Use
Permanent or temporary — relocatable and expandable
Design wind
[ figure and standard — confirm ]

Usually specified as the entrance to something larger, or as a standalone pavilion.

A large white curve tent with rounded eaves seen from above, set in a landscaped plaza.
Curved eaves · 5 m bays

Curve tent

The eaves curve into the roof instead of meeting it at a corner. Modular in 5 m bays like the clear-span, and specified when the structure has to look considered from the outside.

Events Storage Seasonal
Frame
Extruded aluminium 6061-T6
Membrane
850 g/m² PVC-coated polyester
Roof pitch
25°
Bay
5 m modules — expandable
Components
Hot-dip galvanised steel
Accessories
Curtain, lining, cassette deck, ground anchors, weight plates, glass, ABS or sandwich walls
Design wind
[ figure and standard — confirm ]

The curved eave costs more to make and buys nothing structurally. It is an appearance decision, and a legitimate one.

Capacity is a guide at roughly 1 m² per person standing and 1.5 m² seated. It is not an occupancy figure — that is set by the authority from the exits, and it is one of the things we settle before anything is ordered.

What changes

Same frame. Four completely different jobs.

A black sha'ar majlis tent with a glazed window band, standing on a lawn beside a villa wall.

Ramadan & majlis

A Ramadan majlis is a room, not a cover. It is judged on the lining, the light and how it feels to sit in for three hours, and it is wanted on a fixed date by a fixed hour. That is why the work is scoped months ahead and why the fit-out matters more than the span.

What we settle first
  • The date it has to be standing, and the date it comes down
  • Lining, flooring and seating — the fit-out is most of the impression
  • Cooling, and where the power for it comes from
  • Separate entrances or a screened section, if that is expected
  • Whether the ground can be anchored, or has to be ballasted
Usually one of these Majlis tent Clear-span tent Pagoda tent Send a requirement for this
Standard sizes

Pick the span. Add the bays.

These are the standard modular sizes we build to. Length is added in 5 m bays, so pick the span from the table and tell us how long you need it.

Clear-span tent

Span widthEave heightRidge heightBay
10 m3 m5.02 m5 m
15 m3 m6.11 m5 m
20 m3 m7.15 m5 m
25 m4 m9.22 m5 m
30 m4 m10.2 m5 m
40 m4 m12.3 m5 m

Arcum tent

Span widthEave heightRidge heightBay
10 m4 m5.6 m5 m
15 m4 m6.4 m5 m
20 m4 m7.1 m5 m
30 m4 m / 5 m8.8 m / 10.8 m5 m

Read the eave height, not the ridge. The eave is the height you actually have at the wall, and it is what decides whether a vehicle gets in, where a truss can hang and how the space feels along the edges — which is where most people end up standing.

The roof

Three grades, and the topcoat matters more than the weight.

Every roof we supply is PVC-coated polyester. The grade is the decision, and it is mostly a decision about how long the tent has to stand.

GradeBase clothTensile, warp / weftTypical service lifeWhere it belongs
650 g/m²1000D, 20 × 202200–2600 / 2100–2500 N/5cm7 to 10 yearsLinings, short-duration and hire stock
850 g/m²1000D, 23 × 232700–3000 / 2500–2800 N/5cm10 to 15 yearsOur standard roof on every tent on this page
900 g/m²1000D, 30 × 303500–4000 / 3200–3600 N/5cm15 to 20 yearsLong-standing and industrial spans

Typical for the gradeBase cloth and strength figures are the published industry values for each grade of PVC-coated polyester, not test results from a particular roll. The certificate that matters on your project is the one issued for the material actually supplied, and it comes with the handover file.

The topcoat decides the lifespan, not the weight

An untreated PVC surface holds up for three to five years outdoors before it starts to grey and hold dirt. An acrylic lacquer takes it further. A PVDF topcoat is the one specified where UV is relentless, and it keeps its appearance and sheds dirt for fifteen to twenty years. In this climate that difference is the whole argument.

Translucent or blockout

A translucent white roof gives usable daylight underneath and needs less lighting during the day. A blockout roof — typically a 650 g/m² translucent white with a blockout layer — is specified where projection, staging or storage means you want the light controlled instead.

Flame retardancy is a certificate, not an adjective

"Flame retardant" on its own means nothing. What an authority accepts is a test certificate against a named standard, from an approved laboratory, for the material supplied — and a permanently fixed label identifying the size and material of the structure.

Temperature range

PVC-coated polyester is rated across a wide temperature band by its manufacturers. The end of it that matters here is the top: sustained heat, and the UV that comes with it, is what ages a roof in the Gulf.

What holds it down

A tent does not fall over. It lifts.

A tent does not blow away because it is too light. Wind passing over the roof lifts it, and the anchoring has to hold that uplift down. Which method we use is settled on site, because it depends entirely on what the tent is standing on.

Ballast

Concrete weights or steel plates

Weights sit on or beside each baseplate and hold the frame down without anything being fixed into the ground. This is the default for short duration, for hire work, for hard standing and for anywhere the surface has to be handed back untouched.

SuitsGrass · paving · asphalt · roof decks · anything that must not be drilled

Ground anchors

Driven rod anchors or stakes

Rods driven into soil or compacted sand, taking the uplift into the ground itself. Cheaper and faster than ballast where the ground allows it, and the ground is made good on removal.

SuitsSoil · sand · compacted ground with nothing buried beneath

Bolted

Expansion bolts into a slab

The baseplate is fixed into an existing concrete slab. The right answer when the structure stands for a year or more, and the only one that leaves no ballast footprint around the perimeter.

SuitsExisting concrete slab · long-duration and permanent installations

Combination

Bolted where there is slab, ballasted where there is not

Very common in practice. A tent that lands half on a car park and half on landscaping is anchored two different ways, and the survey is what tells us where the line falls.

SuitsMixed ground · phased sites · anywhere the slab stops short

A white clear-span tent on open ground beyond a grass bank, with the ballast grid visible on the lawn in front of it.
Ballast laid out on grass before the frame goes up. Nothing is drilled, and the lawn is handed back as it was found.

Before we quote an anchoring method we ask what is under the surface. Services, tanks, a podium slab or a waterproofing membrane all change the answer, and none of them are visible from a photograph.

Wind

Why we will not print a wind speed on this page.

Almost every tent sold in this market is advertised with a wind figure and no standard attached. We would rather explain what the number would have to say to mean anything.

A speed on its own is not a rating

A wind figure means something once it names the averaging period, the exposure category and the anchoring condition it assumes. The same tent honestly carries very different numbers under different assumptions — which is why two suppliers can quote the same structure at 80 and at 120.

Uplift is the load that matters

Wind over a roof creates suction. The frame is rarely what fails; the anchoring is. This is why we spend the survey on the ground rather than on the tent.

Exposure is site-specific

An identical tent in a walled garden and on open desert are not the same structural problem. Nothing published in a catalogue can settle that.

There is a wind speed at which it comes down

Every temporary structure has one, ours included. A management plan that says who watches the forecast and who calls it is part of a serious installation, and we will write one with you.

[ design wind speed and standard — to be published once confirmed ]

Inside

Walls, floor, climate, fit-out.

The frame and the roof are the easy half. What the space is actually like to be in comes from the four decisions below, and they are usually where a budget is won or lost.

The interior of a white clear-span tent at night, lined and carpeted in red, with sofas, low tables, two portable air-conditioning units and the gable frame and purlins visible overhead.
Walls
  • Open on all sides
  • PVC walls, plain or with windows
  • Glass panel walls and doors
  • ABS hard walls
  • Sandwich panel, insulated
Floor
  • Ground as found
  • Carpet laid direct
  • Raised cassette deck, levelled
  • Deck with a finished floor over
Climate
  • Ventilated — gable vents and open sides
  • Portable cooling units
  • Ducted cooling into a sealed lining
  • Heating, for winter events
Fit-out
  • Ceiling lining and drapes
  • Lighting — general and decorative
  • Power distribution and a generator
  • Furniture, staging and screening

A cooled tent has to be a sealed tent, which means a lining, closed walls and a power supply sized for the units. It is the single change that most often moves a quotation, so it is worth deciding early.

How long

Duration decides more than price.

How long the tent stands changes more than the price. It changes the anchoring, the membrane grade, the paperwork and whether you should be buying it at all.

Days to a fortnight

Hire

Ballasted, nothing drilled, up and down by our crew. The ground is handed back as it was found. This is where most event work sits.

650 g/m² is sufficient · ballast · full set-up and strike

A season

Hire or buy

Ramadan, a winter dining season, a marketing period. Worth doing the arithmetic — if you will want it again next year, buying and storing it often costs less than hiring twice.

850 g/m² · ballast or ground anchors · storage between seasons

A year or more

Buy

Now it is an asset rather than an event. It should be bolted or anchored properly, specified in a heavier membrane, and put on an inspection schedule like any other structure on the site.

850 or 900 g/m² · bolted or anchored · inspection schedule

Indefinitely

Ask us whether it should be a tent at all

If nothing is ever coming down, a tent may be the wrong purchase. A tensile structure or a fixed canopy will usually cost less over its life and look better doing it. We will say so rather than sell you a tent.

Talk to us about a tensile structure instead
Approvals

The paperwork delays openings more often than the build.

A tent over a certain size, used by the public, is a temporary structure in the eyes of the authorities — and the paperwork is usually what delays an opening, not the build. Here is what is generally asked for, so nothing on your side is a surprise.

01
Fire certification

Test certificates showing the membrane, and every lining, drape and scenic fabric inside it, are flame-retardant to a recognised standard from an approved laboratory. NFPA 701 is the standard UAE authorities name most often. The structure also carries a permanently fixed label identifying its size and material.

02
Drawings and calculations

Scaled plans showing exits, aisle widths, travel distances and assembly points; a roof or rigging plan if anything is hung from the frame; and structural calculations covering the tie-downs or ballast and the wind actions assumed.

03
Notice and inspection

In Abu Dhabi the framework asks for plans to reach the authority at least ten working days before erection, an inspection after it is up and at least two days before the event, and removal within three days of the permit expiring. Dubai runs its own route through the tent permit and a Civil Defence review. Other emirates vary.

04
On the day

Extinguishers at the exits, generator enclosures, emergency lighting, and a headcount that does not exceed what the exits were sized for.

This is a summary of what is generally required, not legal advice, and requirements differ by emirate, by venue and by the nature of the event. We will tell you which apply to your job and what we handle.

The tent book

The European standard for tents — EN 13782, which applies from about 50 m² of ground area — asks for more than a structure. It asks for a record: the design documents, the drawings, and a log of every examination the tent has had, kept with the tent for its life. It is called the tent book.

That is our asset record, written into a standard, twenty years before we built one. A tent that moves between sites and crews is exactly the kind of asset that loses its history — and a tent with no history is one nobody can certify. Every structure we supply goes onto the same register as everything else we install.

How we keep asset records
If you buy it

Buying rather than hiring

A hired tent is our problem for the fortnight. A bought tent is your asset for years, and it should come with the same terms as anything else we install.

Frame
[ structural warranty term — confirm ]
Membrane
Warranted separately from the frame, by grade and topcoat
What decides it
Membrane grade, topcoat, how long it stands and how it is stored
Issued
In writing on handover, with the specification it applies to
Handover file
Drawings, fire certificate, anchoring detail and the asset record

The frame outlasts the roof by a wide margin, which is the point. A membrane is a consumable with a known life; a properly specified aluminium frame is not. Re-skinning a good frame is a fraction of replacing a tent.

Get a price

Tell us about the job.

No price on this page, because the span, the ground and the duration decide it. Answer what you can — with a rough size, your dates and a photograph of the space we can usually price it on the call.

01The job
02The site
One photograph of the whole space, one of the ground where the tent will sit, and a site plan if you have one. That is usually enough to price it.
03How to reach you
This is what we receive

        
Call instead

We reply the same working day. If the date is tight we will tell you honestly whether it is achievable before anything else.

Before you book

Twelve questions worth asking every supplier.

Ask us these too. Two tents that photograph identically can be a very different purchase.

01What grade is the membrane, and what is the topcoat?
02Can I see the fire test certificate for the fabric you will actually supply?
03What is the eave height, not the ridge height?
04How will it be anchored on my ground, and why that method?
05What wind speed is it designed for — and to what standard?
06Who submits the drawings and calculations to the authority?
07Is the price for supply, or supply and erection?
08Who takes it down, and when?
09How is the ground left afterwards?
10What is included inside — lining, floor, lighting, cooling?
11If I am buying it, what is the warranty on the frame and on the membrane?
12Where is it stored between seasons, and by whom?

Question two settles it fastest. A supplier who cannot produce the fire certificate for the fabric they are about to put over your guests has not been asked for it before. See the full buying guidance.

Not ready to send a requirement

Ask the assistant which tent fits your date

Ramadan majlis · Hire or buy · What holds it down · Permits and fire certificates · What span for how many people · Cooling a tent

Ask a question
Beyond the event

A tent that keeps its history is a tent that can be certified.

Frames move between sites and crews change. Without a record, nobody can say what the structure is, what it was tested to, or when it was last examined. Every tent we supply goes onto the same asset register as everything else we install.

See lifecycle services
  1. Specify
  2. Certify
  3. Erect
  4. Inspect
  5. Maintain
  6. Re-skin
  7. Store
  8. Re-erect
Ready when you are

Tell us the date first.

Everything else follows from it — the structure, the anchoring, the approvals and whether hiring or buying is the better purchase. Send the dates, a rough size and a photograph of the space.

Send your requirement Call [ +971 · phone ] [ Saturday – Thursday, 8am – 7pm ]
Ask Get a quote