Dubai, United Arab Emirates
Made for life under the sun Ask the assistant عربي Trade & Specifier
Home/Services
Services

Twelve services. Six of them repeat.

Three happen before anything is built. Two build it. Six keep it standing for as long as you own it. One takes it down safely at the end. Most of this industry sells the first five and calls the job finished.

Book an inspection Book a site survey
We service structures we did not build
BEFORE BUILD END OF LIFE THE LOOP — SIX SERVICES, REPEATING Site survey Engineering & design Approvals support Installation Handover & record Inspection Preventive maintenance Repairs Fabric replacement Refurbishment Annual contract REPEATS FOR THE LIFE OF THE STRUCTURE Decommissioning
Swipe the map →
The six inside the gold boundary are the ones that never finish.
The catalogue

Everything we do, in the order it happens.

Grouped by where each service sits in the life of a structure — because that is what determines whether you buy it once or every year.

Stage 01 · Site survey

Site survey

A price quoted before anyone has seen the site is a guess wearing a number. It is also how a project ends up with the wrong fixing into the wrong substrate.

  • What we measure. Clear span and projection, fixing substrate and its condition, level and fall, orientation and sun path through the day, drainage and where water will actually go, and access for installation plant.
  • What we photograph. Every proposed fixing point, every obstruction, and the existing condition — so the record survives the conversation.
  • What you get. A measured record, a feasibility note, and the products that genuinely fit — including, when it is true, the answer that none of ours do.
  • What happens next. The survey goes to engineering for load and fixing checks, and the quotation is built from it rather than from a phone call.
LEAD TIME Within [ n ] business days ON SITE [ n ] minutes, typically COST [ free / AED n ]
SUN PATH FALL AND DISCHARGE DIRECTION FIXING SUBSTRATE HEADROOM CLEAR SPAN
Swipe the drawing →
Six of the things a survey records. A quotation written without them is a guess.
Stage 03 · Inspection

Inspection

Most shade structures in this market have never been inspected. The first inspection is usually the one that happens after something has already failed.

  • Six points, every visit. Membrane, seams and welds, cables and tensioning, fixings and connections, structure and foundations, drainage. The same six, in the same order, whoever attends.
  • A published methodology. What is checked, what is measured, and what triggers a repair rather than a replacement — set out below rather than described on request.
  • A written condition record. Photographs, findings, severity and the next action, filed against the asset reference so the history builds year on year.
  • Whether or not we built it. An existing structure of any age or origin can be inspected and put onto the register.
INTERVAL Set per structure at handover INCLUDED IN Every AMC tier
1 2 3 4 5 6 SIX POINTS, EVERY VISIT, IN THE SAME ORDER
Swipe the drawing →
The numbers match the methodology below.
# What we check What it triggers 1 Membrane Surface condition, UV chalking, tear initiation, ponding and soiling. Localised damage triggers a patch; loss of coating across the field triggers a replacement assessment. 2 Seams & welds Peel and creep at welded seams, edge and keder condition. Any seam movement is repaired at the visit; progressive seam failure is a replacement indicator, not a repair. 3 Cables & tensioning Tension against the commissioning record, cable and fitting corrosion, turnbuckle condition. Out-of-tolerance tension is re-tensioned; corroded fittings are replaced. 4 Fixings & connections Torque, corrosion, substrate condition around the fixing, plate and weld condition. This is the point where most failures start and where the fewest people look. 5 Structure & foundations Member alignment, coating breakdown, weld condition, base plate and foundation movement. Movement triggers a structural review before any further work. 6 Drainage Discharge path, outlet blockage, standing water and evidence of ponding. Ponding is treated as a structural finding, not a cleaning one.
SVC-INSPECT-01
Inspection image An engineer inspecting a standing structure — measuring, photographing, recording. Weathered asset, working light, no theatre. The single most valuable photograph on this site: no competitor has one. 16:5 · 3:2 mobile
Stage 03 · Annual Maintenance Contract

An annual contract is only worth what happens on the visits.

So here is what happens on one. Five of the six loop services, scheduled rather than requested, with a call-out response time you can hold us to between visits.

Compare the three packages

What a scheduled visit contains

  • Clean. Membrane wash-down and removal of dust, salt and organic soiling — the single biggest determinant of how long a fabric lasts here.
  • Re-tension. Checked against the commissioning record and reset to specification, not to feel.
  • Inspect. All six points, recorded against the asset reference.
  • Repair. Minor work completed in the visit, within the tier limit, rather than quoted and rescheduled.
  • Record. Findings, photographs, work done and the next action, filed to the asset history.
VISITS 2, 4 or 6 a year by tier RESPONSE 5 days, 48 or 24 hours by tier

Getting onto a contract

Four steps. The tier is recommended from what we find, not chosen from a brochure.

01

Site assessment & asset inventory

Every structure across every site recorded — type, fabric condition, fixings, age.

02

Tier recommended

Informed by asset count, condition and risk profile. A single sound structure does not need the premium tier and we will say so.

03

Contract issued

Countersigned, with the full maintenance schedule and renewal dates set from day one.

04

First visit within 15 business days

Of signing — to establish the baseline condition record the whole contract runs against.

Stage 03 · Fabric replacement

Fabric replacement

There is a point on every membrane's life where the next patch costs more than the replacement would have. Almost nobody tells the owner where that point is.

  • Why membranes fail here. UV load, daily heat cycling, airborne dust abrasion and salt — a Gulf membrane ages faster than the same fabric in a temperate climate, and its published life reflects a climate it is not in.
  • The frame usually survives. Where the structure, fixings and cables are sound, a new membrane onto the existing frame costs a fraction of a rebuild and resets the asset's life.
  • What is involved. Pattern from the as-built or re-survey, fabricate, remove, install, tension to specification and record the new commissioning tension.
  • What you get. A new membrane, a reset tension record, a new warranty and a revised expected service life on the asset record.
MEMBRANES PVDF · PVC · HDPE · PTFE DECIDED BY Inspection, not by age alone
HIGHER LOWER TIME → CUMULATIVE SPEND REPEATED REPAIRS ONE REPLACEMENT CROSSOVER
Swipe the chart →
Illustrative, not measured data. Where the crossover falls on your structure comes from its inspection history, which is the argument for having one.
SVC-FABRIC-01
Fabric replacement image A membrane being removed or tensioned on a sound existing frame. Shows the argument the section makes: the frame survives, the fabric is the consumable. 16:5 · 3:2 mobile
Existing structures

We did not build it. We will still look after it.

Roughly everything already standing in this market was installed by somebody else, often by somebody no longer answering the phone. None of that disqualifies a structure from being inspected, maintained, repaired, re-skinned or put on a register.

We inspect it, tell you honestly what condition it is in — including when the answer is that it should come down — and price the work from what we find.

Any origin Whoever
installed it

Ours, a competitor's, or a structure nobody can identify.

Any age Whatever
its condition

Including structures already past the point of economic repair.

Any scale One bay to
a portfolio

A single villa shade or every structure across forty sites.

Honest finding Including
“take it down”

If a structure is unsafe, that is the report — not a quotation.

Next step

Where are you in the life of your structure?

Not sure which service you need

Ask the assistant about your structure

Repair or replace · What an inspection covers · Maintenance intervals · Fabric life · What a visit should include

Ask a question
Nothing built yet

Book a site survey

Measured record, feasibility note and the products that actually fit your space.

Book a survey
Standing, unmanaged

Book an inspection

Six points, a written condition record, and an honest view of what it needs next.

Book an inspection
Ready for a schedule

Request an AMC assessment

Asset inventory, recommended tier and a contracted response time between visits.

Request assessment
Ask Get a quote