Dubai, United Arab Emirates
Made for life under the sun Ask the assistant عربي Trade & Specifier
Home/Solutions
Solutions

Whatever you own, someone has to look after it.

A villa owner, a facilities manager with forty sites, a consultant specifying a canopy and a school with a structure over its playground are not buying the same thing. They do all end in the same place — a structure that is inspected on a schedule instead of remembered after it fails.

Book a site survey Compare AMC packages
HOMEOWNERS FM & LANDLORDS DEVELOPERS SCHOOLS GOVERNMENT SITE SURVEY every route starts here BUY ONLINE CONFIGURE & QUOTE ENGINEERED PROJECT ON A MAINTENANCE SCHEDULE
Swipe the diagram →
Four routes in, one survey, three ways to buy — and a single destination.
Start here

Which of these are you?

The engineering standard does not change. What changes is the survey, the paperwork and how you buy.

01 · Residential

Homeowners & villa owners

Three quotes for the same shade, varying by a factor of three, none of them explaining what the difference buys you. Then whoever installs it is never heard from again.

  • A survey before a price. We measure the space, check the fixing substrate and the drainage, and quote from what is actually there.
  • Two to four weeks, survey to installation. Short cycle, funded by deposit and progress payments, with the dates agreed up front.
  • Published specification. Frame section, coating, membrane grade, span rating and warranty terms — before you pay, not after.
  • A maintenance schedule when the warranty ends. Not an upsell — the point at which a structure starts needing attention is knowable, so we tell you when it is.
PRODUCTS Awnings · Pergolas · Car parking · Sail shades · Canopies HOW YOU BUY Online or configure & quote
COVERED AREA
Swipe the drawing →
Awning and pergola on one villa terrace — surveyed and dimensioned together, not sold as two jobs.
02 · Facility management

Facility management & commercial landlords

Shade sits on nobody's vendor list. It is inspected when a tenant complains, repaired by whoever answers the phone, and has no condition history anyone can produce at audit.

  • One accredited vendor across the portfolio. Every site on the same schedule, the same scope and the same report format — regardless of who built the structures.
  • SLA-backed response. Call-out response time is contracted, published by tier, and measured — not promised on a call.
  • Digital condition reporting, not paper job sheets. Every visit produces a record you can hand to an auditor, an insurer or an incoming FM provider.
  • An asset inventory at onboarding. Structures, fabric condition and fixings recorded per site before the first scheduled visit, so the baseline is real.
COMMERCIAL MODEL Annual Maintenance Contract TIERS Essential · Standard · Premium
SITE A SITE B SITE C SITE [ n ] ASSET REGISTER one record, all sites SCHEDULED VISIT 2, 4 or 6 a year CONDITION REPORT back onto the record AUDITABLE AT EVERY POINT — NO PAPER JOB SHEETS
Swipe the diagram →
The register is the product. The visits keep it true.
SOL-FM-01
Facility management context A managed portfolio in use — several structures across one commercial or residential site, seen together. Communicates scale of responsibility rather than a single product. 16:5 · 3:2 mobile
03 · Developers & consultants

Developers & consultants

Shade arrives late in the drawing set, gets value-engineered by someone reading a price rather than a load case, and is handed over with no maintenance plan attached.

  • Engineering support from inception. Structural calculations and drawings produced in-house, early enough to influence the design rather than justify it.
  • Specification you can put in a tender. Materials, spans, wind and UV ratings written so the package can be priced fairly by anyone bidding it.
  • Approvals support. Documentation prepared for authority submission, in the format the reviewer expects.
  • A handover pack, not a pile of invoices. Asset record, as-built specification, warranty terms and the first inspection date, issued on the day.
WORKS WITH Architects · Consultants · Main contractors · Developers DELIVERABLES Calculations · Drawings · Specification · O&M
DESIGN WIND LOAD ANALYSIS MODEL AS BUILT
Swipe the drawing →
The calculation and the canopy are the same deliverable, produced by the same team.
04 · Public & institutional

Schools, parks authorities & government

The structure over a playground is safety-critical infrastructure. If it fails, the liability sits with the authority that owns it — and the first question asked will be when it was last inspected, and by whom.

  • Condition survey and asset register. Every structure recorded with its specification, condition, fixings and inspection history — whether or not we built it.
  • A documented inspection methodology. What is checked, at what interval, and what triggers a repair rather than a replacement. Published, not described on request.
  • Engineering-backed documentation. Calculations, drawings and reports in a form that survives audit and supports a tender submission.
  • Contracted response times. Call-out response committed by tier, so an unsafe structure has a defined clock on it rather than a phone call.
SECTORS Schools · Universities · Parks · Municipalities · Transport · Health ROUTE Tender, framework or direct award
ASSET ID [ reference ] INSPECTED ON A SCHEDULE
Swipe the drawing →
Every structure carries a reference, a condition record and a next inspection date.
SOL-INST-01
Institutional context A school, hospital or public facility with a canopy over a route people actually use. Shows the consequence of failure without dramatising it. 16:5 · 3:2 mobile
Annual Maintenance Contracts

Three packages. Published scope, published response times.

The difference between tiers is how often we come, how fast we come when you call, and how much repair is already paid for. Everything below is contractual, not indicative.

Scope and response times are contracted. Pricing is set from the site assessment — asset count, condition and risk profile — because a fair number cannot be quoted before someone has seen the structures.
Package Essential Most selectedStandard Premium
Scheduled visits per year 246
Priority call-out response 5 business days48 hours24 hours
Minor repairs included Quoted separately Included up to a per-visit limit Included at the highest per-visit limit
Cleaning & re-tensioning IncludedIncludedIncluded
Cable & fixing inspection Visual onlyFull inspectionFull inspection + report
Digital condition report Not includedAnnualAfter every visit
Suits A single structure in good condition Most residential and multi-site commercial portfolios Safety-critical, high-traffic or public-facing assets
Annual price From site assessment From site assessment From site assessment
Request assessment Request assessment Request assessment
Swipe the table →
What we commit to

Dates, not intentions.

Four commitments that appear in the contract. They are the reason a maintenance-first company can plan its crews — and the reason you can plan around us.

Site survey Within [ n ]
business days

From enquiry to someone standing on your site with a measure and a camera.

Residential install 2–4 weeks
survey to install

Short cycle, staged payments, dates agreed before the deposit.

First AMC visit Within 15
business days

Of signing — to establish the baseline condition record the contract runs against.

Call-out response 24, 48 hours
or 5 days

By package tier. Contracted and measured, not offered on the phone.

By application

Or start from the space.

If you already know the area you want covered, begin here and we will narrow the product.

Next step

Every route starts with a survey.

Not sure which of these you are

Ask the assistant before you decide

Owned, rented or managed · Permanent vs temporary · What a portfolio needs · Lifecycle cost · Where to start

Ask a question
You have a space to cover

Book a site survey

We measure, check the substrate and the drainage, and quote from what is there. No charge, no obligation.

Book a survey
You have structures already

Request an assessment

Asset inventory and condition across one site or forty, then the package that fits what we find.

Request assessment
You are preparing a tender

Contact procurement

Pre-qualification documents, engineering support and specification assistance for your package.

Contact procurement
Ask Get a quote