Schools & Playgrounds
Shade where children learn, play and gather.
Explore
Lightweight architectural shade designed around people, place and climate — from school playgrounds and public walkways to sports facilities, resorts and healthcare entrances.
Every tensile structure is priced after a site inspection, because geometry, span, exposure and foundations decide the number. Send us measurements and photographs and we can often price it on the call.
The application decides the geometry, the membrane and the engineering — not the other way round. Pick the space you are covering.
Schools & Playgrounds
Shade where children learn, play and gather.
Explore
Walkways & Entrances
Weather protection for arrival and movement.
Explore
Parks & Public Realm
Shade for shared and community space.
Explore
Hospitals & Resorts
Outdoor comfort where appearance is part of the service.
Explore

A school buys shade for the hours between lessons — assembly, break, queuing, waiting for a parent. The structure has to work with children under it, which changes what matters: clear headroom, no low edges at head height, columns positioned out of running lines, and a fabric that can be inspected and re-tensioned during a holiday rather than a term.
What we decide first
A covered route is a repeated structure, so the detail that matters most is the one that repeats. Bay spacing, mast diameter and the height of the low edge decide whether a walkway reads as architecture or as a row of poles. Where it meets a building or a road, clearance and drainage decide the rest.
What we decide first
Public structures are used by everyone and maintained by whoever holds the contract. That makes two things decisive: a form that stays taut and looks deliberate for years, and details that can be reached and serviced without closing the space. Fixings are specified on the assumption that they will be touched by the public.
What we decide firstSports shade is a span problem before it is a shade problem. Seating and courts need clear area, which pushes the structure toward fewer, larger elements and moves the load into the masts and foundations. Wind uplift on a large open canopy is the governing case, not the weight of the fabric.
What we decide first
In a hospital or a resort the structure is in front of guests, patients and visitors every day, and it cannot be taken out of service easily. That pushes the specification up: a membrane that stays clean and stays white, connections that can be inspected without scaffolding a public entrance, and a maintenance interval agreed before handover rather than after the first complaint.
What we decide firstFour geometries cover most of what we build. Filter by where it is going to see which suit.
Two high corners, two low. The double curvature is what keeps it taut.
The workhorse of sail shading, and the form most people picture. Opposing curvature in two directions means every point on the membrane is held by tension in both — which is why a correctly tensioned hypar does not flap, and why a flat sail always will.
SuitsPlaygrounds, courtyards, poolsides, parking, single- and multi-bay runs
A mast pushes a high point up through the membrane.
A cone sheds water positively from the peak outward and gives dramatic height at the centre without raising the whole perimeter. Repeated across a grid, cones cover large areas while keeping each individual membrane panel a manageable size.
SuitsPlazas, forecourts, entrances, multi-bay grids over large paved areas
One large cone over a whole courtyard, tensioned from a central ring.
Where a courtyard has to be covered in one move. The membrane is cut into radial panels and tensioned outward from a crown ring, which usually carries a vent. The seam pattern is the structure made visible — it follows the lines the tension actually takes.
SuitsSchool and institutional courtyards, atria, large single spaces
Sails repeated on paired masts to form a continuous covered route.
The same geometry as a hypar, resolved as a module and repeated. Because it repeats, the bay dimension is the design decision: it sets the mast count, the foundation count, the rhythm of the route and most of the cost.
SuitsCovered walkways, connections between buildings, drop-offs, queue lines
Nothing in this list matches. Call us and describe the space — the geometry is designed to the site, not chosen from a menu.
These are the forms we have built and photographed. Barrel vaults, cable nets and free-form geometry are possible; we will tell you honestly whether one is the right answer for your site or simply a more expensive one.
The single decision that changes most about a tensile structure — what it costs, how it performs and how long it lasts.
Knitted high-density polyethylene monofilament. It shades and breathes; it is not a roof.
Commercial 95, 340 gsm is our common specificationPlaygrounds, car parks, sports and any space where the point is sun and heat rather than rain.
Because it breathes, it is more forgiving in wind than a solid membrane of the same area — but it is still a structural surface, and it still has to be tensioned properly.
A woven polyester base coated both sides in PVC. Waterproof, weldable, and the standard material for permanent tensile architecture.
European architectural gradeWalkways, entrances, hospitality, and anywhere the space beneath has to stay dry.
Type is not a style choice. It is selected from the span, the geometry and the calculated wind load — a larger or more exposed structure needs a heavier fabric and a stronger weld.
Woven glass fibre coated in PTFE. The longest-life architectural membrane, and the most expensive.
Specified where design life governsLandmark, institutional and long-horizon assets where the whole-life cost matters more than the first cost.
PTFE glass is brittle until installed and cannot be folded like PVC. It changes how the structure is fabricated, shipped and erected — which is part of why it costs more.
| Consideration | HDPE mesh | PVC-coated polyester | PTFE-coated glass |
|---|---|---|---|
| Keeps rain off | No | Yes | Yes |
| Breathes | Yes | No | No |
| Typical weight | 340 gsm | 850–1050 g/m² | ≈ 1.5 kg/m² |
| Seams | Stitched | Welded | Welded |
| Light through | Filtered through the knit | Translucent, grade dependent | 9–16% |
| Service life | Shortest of the three | Over 20 years, correctly designed | 30–50 years |
| Relative cost | Lowest | Middle | Highest |
| Where we use it | Playgrounds, parking, sports | Walkways, entrances, hospitality | Landmark and long-horizon assets |
Weight and grade are not a style choice. They are selected from the design, the structure, the fabric span and the calculated wind load — which is why we do not publish a single fabric specification for a product that has not been designed yet.
A tensile structure carries load in tension only. Every part of it exists to get that tension into the ground.
Double curvature is not decoration. A surface curved in opposing directions is held in tension everywhere, which is why it stays taut. A flat sail cannot be tensioned and will always move in wind.
Circular hollow section, mild steel or hot-dip galvanised. Round sections resist torsion well, buckle predictably and present the same face to wind from any direction — which matters when the load can arrive from anywhere.
Corner plates, shackles, turnbuckles and cable ends. This is where tension concentrates and where inspection matters most. Most tensile problems are connection problems.
A tensile mast is loaded sideways and pulled upward, so the foundation resists overturning and uplift rather than simply carrying weight. It is sized from the wind calculation, and it is usually larger than people expect.
Water goes where the geometry sends it. On a cone it runs off the peak; on a hypar it leaves at the low corners. Deciding where those corners point is a design decision, not an accident.
A membrane is installed under tension and stays under tension. Too little and it flaps; too much and the loads in the structure rise. Re-tensioning is a normal maintenance operation, not a defect.
The codes and standards above are the published references a tensile structure is designed against. The calculation for your structure is produced for your site, and issued with the quotation.
A structure in Al Ain and a structure on the Corniche face different problems. Neither is solved by a blanket claim about the weather.
Constant, high-angle and year-round. It decides fabric grade and colour retention more than any other factor.
Large daily swings work every joint and every fixing. Connections are detailed to move.
Uplift on an open canopy governs the design. It sizes the mast, the cables and the foundation.
Settles on any surface and is washed into low corners. It affects appearance and cleaning interval.
Infrequent and heavy. Where the water leaves the structure matters more than how much falls.
Near the sea, chloride decides the steel and the coating. Inland the same structure can be built more simply.
There is no price on this page because there is no honest one until the site is understood. Answer what you can — with measurements and photographs we can often price it on the call.
Photographs of ZIL Shades tensile structures. Where a client has not given consent to be named, the site is not identified.
Ask every bidder these, including us. The answers separate an engineered structure from a fabricated one, and they cost nothing to ask.
A quotation that cannot answer these is not cheaper than one that can. It is a different product. See the full buying guidance.
What a hypar is · Mesh or membrane · What affects the cost · What to put in an RFQ · How to compare two quotations · Inspection intervals
Fabric needs inspecting and re-tensioning. Fixings need checking. Eventually the membrane is replaced and the structure carries on. We can hold that whole cycle, or just the part you need.
See lifecycle servicesTell us where the structure goes, what it has to do and what you are working around. We will tell you the appropriate direction before anyone talks about engineering fees.